Pulled the exact AS/NZS 3000 clause mid-inspection. Inspector had nothing to push back on.
Get instant responses grounded in AS/NZS, the NCC and your state regs, cited to the exact clause and page.
Trusted by Australian trades and partner suppliers.









Real questions from the chat, anonymised. Sign up to see the answers, cited to the clause and the page.
“How far does earth steak need to be into the ground”
Answer: Earth electrodes must be driven to a minimum depth of 1.2 m in Australia. That's the minimum — deeper is better in dry or sandy soils where moisture…
See the answer“Does a laundry need a separate tub?”
Two separate questions — I'll knock them both over. Floor waste in a laundry (QLD) Answer: Not strictly mandated by the NCC, but effectively required by AS/NZS…
See the answer“What size men should you use”
Answer: The MEN conductor must be at least as large as the main neutral conductor, with a minimum size calculated from Table 5.1 based on the largest active…
See the answer“what kind of bedding do i put under a stormwater pipe that is at 45 degrees? is it still crushed rock aka quarter minus?”
Answer: At a 45% grade (steeper than 1:5 / 20%), you must use cement mortar bedding — not crushed rock. The gradient trigger is the key thing here. Below 1:5…
See the answer“How does the NCC define a Class 1a building?”
Answer: A Class 1a building is a single dwelling — a house, or one of a group of attached dwellings (like a terrace or townhouse) where each is separated by a…
See the answer“What are the rules for installing a switchboard inside a cupboard?”
Answer: A switchboard in a cupboard must be in its own separated section, installed at the front, facing the door, with no storage space left in front of it.…
See the answer“How far does earth steak need to be into the ground”
Answer: Earth electrodes must be driven to a minimum depth of 1.2 m in Australia. That's the minimum — deeper is better in dry or sandy soils where moisture…
See the answer“Does a laundry need a separate tub?”
Two separate questions — I'll knock them both over. Floor waste in a laundry (QLD) Answer: Not strictly mandated by the NCC, but effectively required by AS/NZS…
See the answer“What size men should you use”
Answer: The MEN conductor must be at least as large as the main neutral conductor, with a minimum size calculated from Table 5.1 based on the largest active…
See the answer“what kind of bedding do i put under a stormwater pipe that is at 45 degrees? is it still crushed rock aka quarter minus?”
Answer: At a 45% grade (steeper than 1:5 / 20%), you must use cement mortar bedding — not crushed rock. The gradient trigger is the key thing here. Below 1:5…
See the answer“How does the NCC define a Class 1a building?”
Answer: A Class 1a building is a single dwelling — a house, or one of a group of attached dwellings (like a terrace or townhouse) where each is separated by a…
See the answer“What are the rules for installing a switchboard inside a cupboard?”
Answer: A switchboard in a cupboard must be in its own separated section, installed at the front, facing the door, with no storage space left in front of it.…
See the answer“How far does earth steak need to be into the ground”
Answer: Earth electrodes must be driven to a minimum depth of 1.2 m in Australia. That's the minimum — deeper is better in dry or sandy soils where moisture…
See the answer“Does a laundry need a separate tub?”
Two separate questions — I'll knock them both over. Floor waste in a laundry (QLD) Answer: Not strictly mandated by the NCC, but effectively required by AS/NZS…
See the answer“What size men should you use”
Answer: The MEN conductor must be at least as large as the main neutral conductor, with a minimum size calculated from Table 5.1 based on the largest active…
See the answer“what kind of bedding do i put under a stormwater pipe that is at 45 degrees? is it still crushed rock aka quarter minus?”
Answer: At a 45% grade (steeper than 1:5 / 20%), you must use cement mortar bedding — not crushed rock. The gradient trigger is the key thing here. Below 1:5…
See the answer“How does the NCC define a Class 1a building?”
Answer: A Class 1a building is a single dwelling — a house, or one of a group of attached dwellings (like a terrace or townhouse) where each is separated by a…
See the answer“What are the rules for installing a switchboard inside a cupboard?”
Answer: A switchboard in a cupboard must be in its own separated section, installed at the front, facing the door, with no storage space left in front of it.…
See the answer“NCC minimum bedroom ceiling height?”
Answer: 2400 mm minimum finished ceiling height for a habitable room (including bedrooms) in a Class 1 or Class 2 building under the NCC. A few edge cases…
See the answer“When is a pressure-reducing valve required?”
Answer: A pressure-reducing valve (or pressure-limiting valve) is required on the cold water supply to a water heater when mains pressure exceeds the set…
See the answer“are their specific rules around electric fences”
Answer: Yes — electric fences in Australia are governed by AS/NZS 3014:2003, which covers installation requirements for electric fence energisers and the fence…
See the answer“How close can a GPO be to a sink or basin?”
Answer: GPOs must be at least 300 mm horizontally from a sink, basin, or other water source — measured from the nearest edge of the outlet to the nearest edge…
See the answer“What's the minimum cable size for a 20A GPO circuit?”
Answer: 2.5mm² TPS is the minimum cable size for a 20A GPO circuit in most domestic installs, but you need to verify it passes voltage drop and…
See the answer“NCC minimum bedroom ceiling height?”
Answer: 2400 mm minimum finished ceiling height for a habitable room (including bedrooms) in a Class 1 or Class 2 building under the NCC. A few edge cases…
See the answer“When is a pressure-reducing valve required?”
Answer: A pressure-reducing valve (or pressure-limiting valve) is required on the cold water supply to a water heater when mains pressure exceeds the set…
See the answer“are their specific rules around electric fences”
Answer: Yes — electric fences in Australia are governed by AS/NZS 3014:2003, which covers installation requirements for electric fence energisers and the fence…
See the answer“How close can a GPO be to a sink or basin?”
Answer: GPOs must be at least 300 mm horizontally from a sink, basin, or other water source — measured from the nearest edge of the outlet to the nearest edge…
See the answer“What's the minimum cable size for a 20A GPO circuit?”
Answer: 2.5mm² TPS is the minimum cable size for a 20A GPO circuit in most domestic installs, but you need to verify it passes voltage drop and…
See the answer“NCC minimum bedroom ceiling height?”
Answer: 2400 mm minimum finished ceiling height for a habitable room (including bedrooms) in a Class 1 or Class 2 building under the NCC. A few edge cases…
See the answer“When is a pressure-reducing valve required?”
Answer: A pressure-reducing valve (or pressure-limiting valve) is required on the cold water supply to a water heater when mains pressure exceeds the set…
See the answer“are their specific rules around electric fences”
Answer: Yes — electric fences in Australia are governed by AS/NZS 3014:2003, which covers installation requirements for electric fence energisers and the fence…
See the answer“How close can a GPO be to a sink or basin?”
Answer: GPOs must be at least 300 mm horizontally from a sink, basin, or other water source — measured from the nearest edge of the outlet to the nearest edge…
See the answer“What's the minimum cable size for a 20A GPO circuit?”
Answer: 2.5mm² TPS is the minimum cable size for a 20A GPO circuit in most domestic installs, but you need to verify it passes voltage drop and…
See the answerSee, understand and apply what's needed for your role, your site, your install. Quick adjustment or full overhaul.
Run your jobs in Standardsmate too. Job workspace, quotes, invoicing, SWMS, sign-offs — every decision bound to the job, not lost in your inbox.
From sparkies, plumbers, builders and site supers across Australia.
Pulled the exact AS/NZS 3000 clause mid-inspection. Inspector had nothing to push back on.
Saves forty minutes on every SWMS. Cites the reg, flags what to confirm, done.
Client argued the grade on a slab drain. Pulled up AS/NZS 3500.2 Table 5.2 on my phone. Conversation over.
Checked array setbacks and CEC rules from the roof. No climbing down for the laptop.
Sized the duct run and pulled the AS 1668 ventilation rate on site. No callback to the office.
Stair rise and going, balustrade gaps. Got the NCC numbers right the first time, no rework.
Every answer is grounded in real, official Australian Standards — stated, sourced and current. From the Wiring Rules to the NCC, the library spans every trade and territory.
No hidden fees. All prices in AUD.
Try it on real jobs.
Running your own business. Quote, bill and stay compliant on every job.
Managing a crew. A licence for everyone on the tools.
Bigger crew, white-label, or a custom setup? Contact sales →
Australian businesses may be eligible for the R&D Tax Incentive on qualifying software expenses.
Standardsmate™ turns "what does the standard actually say?" into a 20-second answer. Ask about AS/NZS 3000, the NCC or your state's reg and you get the exact clause, the right page, the state variation and a plain-English breakdown of how it applies to the job in front of you. Every answer cites the source, so you can drop it straight into a compliance note or a client email. No PDF hunting, no guesswork, no hallucinated clause numbers.
Electricians, plumbers, builders, HVAC technicians, solar installers, data cablers and their supervisors. If you are responsible for getting a job right under an Australian Standard. On the tools or signing off. Standardsmate™ shaves the lookup time down from 20 minutes to 20 seconds.
Free to start — 20 questions a month after a 7-day trial with no cap, plus 1 job you can quote and invoice. Pro is $49 AUD per month for unlimited questions, unlimited SWMS and up to 10 jobs at once. Business plans for crews and site supervisors start at $79 per seat per month. No setup fees, cancel anytime.
Every answer cites the clause, page and standard it draws from, so you can verify in one tap. The model is grounded in the source documents. Not guessing. And the platform displays a confidence indicator when the citation is exact. Standardsmate™ is an information service, not professional advice. Always check the cited clause and use your own licence and judgement before signing off.
Yes. NSW, VIC, QLD, WA, SA, TAS, ACT and NT. Where states amend the national standard (e.g. CCEW in NSW from July 2026, electrical certificates of compliance in VIC), the answer routes you to the state variation, not just the national rule.
Your chats, drafts and saved jobs are encrypted in transit and at rest, hosted on AWS in Sydney. We don't sell your data and we don't share it with advertisers. Read the privacy policy for the full breakdown.
Cancel from settings in two clicks. No calls. Within 7 days of purchase or renewal we offer a voluntary change-of-mind refund (less the value of any paid credits used). After 7 days, statutory rights apply (Australian Consumer Law, EU/EEA withdrawal where relevant). Full refund policy in the Terms.
Yes. The app is a web platform. Load once on the phone, it stays usable. The chat queues your question if reception drops and answers when it returns. PDFs and SWMS exports work entirely on-device once generated.
Job-management and accounting integrations (Tradify, ServiceM8, AroFlo, simPRO, Xero, MYOB) are on the roadmap. Current beta connects via export. You can also use Standardsmate™ end-to-end as a workspace if you want one place for jobs, quotes, SWMS and team.
Email [email protected] any time, or use the support button in the bottom-right of every page. Pro and Business get priority routing.
AS/NZS revisions, NCC amendments and state regulator updates, the week they land.
No spam, unsubscribe any time. We never sell your details.
See recent changesPick your trade, role or state. We'll load a landing tuned to the clauses and regulators that apply to you.